Large power transformer lead times
constraint a named mechanism, not a conclusion
Power transformers average ~128 weeks and GSUs ~144 weeks, with large units quoted at 48-60 months and OEM backlogs running through 2030. Grid connection physically cannot complete without them, so this gates the grid-connected path the same way turbine slots gate the behind-the-meter path — and it may be the harder of the two.
The path
| node | effect |
|---|---|
| Datacenter AI (Training + Inference) | -1.00 |
| CoreWeave, Inc. | -1.00 |
| Hyperscaler | -0.55 |
| Crusoe Energy Systems | -0.25 |
| Hitachi, Ltd. | +0.80 |
| Siemens Energy AG | +0.80 |
| GE Vernova Inc. | +0.80 |
coverage
Scored on 7 subjects: 4 bound by it, 3 own the scarce thing and are made more valuable by it. Severity is graded by hand against a stated scale, not computed — the sign here is a judgement, and the magnitude is that grade.
Arguments about this mechanism
None yet. No thesis names this mechanism’s subject, which is a gap in the bank rather than a fact about the mechanism.
Arguments that run through it
These name a node on the path rather than the subject, so they pass through this mechanism without being about it. Shown separately and never graded as claims about it — hubs above the graph’s own 90th-percentile degree are excluded, or every argument touching NVIDIA would attach to every mechanism NVIDIA touches.