Heavy-duty gas turbine delivery slots
constraint a named mechanism, not a conclusion
Large gas turbine order books are sold out through 2030 across the three OEMs, so behind-the-meter gas — the fast bypass around the interconnection queue — has its own multi-year queue. This binds the parties whose siting model depends on self-generation, and does NOT bind parties with contracted grid supply.
The path
| node | effect |
|---|---|
| Datacenter AI (Training + Inference) | -1.00 |
| Crusoe Energy Systems | -1.00 |
| CoreWeave, Inc. | -0.55 |
| GE Vernova Inc. | +0.80 |
| Mitsubishi Heavy Industries, Ltd. | +0.80 |
coverage
Scored on 5 subjects: 3 bound by it, 2 own the scarce thing and are made more valuable by it. Severity is graded by hand against a stated scale, not computed — the sign here is a judgement, and the magnitude is that grade.
Arguments about this mechanism
None yet. No thesis names this mechanism’s subject, which is a gap in the bank rather than a fact about the mechanism.
Arguments that run through it
These name a node on the path rather than the subject, so they pass through this mechanism without being about it. Shown separately and never graded as claims about it — hubs above the graph’s own 90th-percentile degree are excluded, or every argument touching NVIDIA would attach to every mechanism NVIDIA touches.